R1100R Major Service Procedure Major Service - every 24,000 miles Version: 3/6/00 Mileage: ___________ Date: ___________ Items needed: oil, 4 qts oil filter oil drain plug washer fuel filter o-ring for fuel tank cover plate (holds the filter and pump) gearbox/final drive oil, 1 liter SAE 80W90 plugs brake fluid * warm bike up * drain engine oil * remove oil filter * drain gearbox oil * drain final drive oil * after engine oil has drained install new filter * fill engine with 4 qts oil: ____________ * fill gearbox with 800 cc of 80W90 SAE oil ____________ * fill final drive with 230 cc of 80W90 SAE oil ____________ * allow engine to cool overnight * remove plugs * adjust valves: intake = 0.006" exhaust=0.012" adjuster screw locknut - 6 ft lb = 72 in lb ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ valve cover bolts - 6 ft lb * change plugs gap: 0.031" left: __________ right: __________ torque to 15 ft lb * check intake manifold clamps (18 inch lb) / check for leaks * replace air filter * replace fuel filter * set clutch freeplay to 5mm at lever tang * check all brake pads for wear * replace front brake fluid * replace rear brake fluid * check brake system p 1.17 * check battery * check wheel bearings * check f & r suspension and steering damper per Haynes p 1.10 ________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________________ * lube stands, pivots, cables per Haynes p 1.11 * 4 foot pegs * clutch cable, throttle cable * clutch lever pivot * brake lever pivot * clutch cable nipples at both ends * throttle cable * brake pedal pivot * shift lever pivots * speedo cable * check throttle and choke cables (p 1.13) * balance throttle bodies * check gearbox oil * check final drive oil * tighten the following nuts * engine oil drain plug - 24 ft lb * gearbox oil drain plug - 22 ft lb * gearbox fill plug - 17 ft lb * final drive fill plug - 17 ft lb * final drive drain plug - 17 ft lb * gear shift lever pivot bolt - 26 ft lb * front brake lever pivot bolt - 6 ft lb * rear brake pedal pivot bolt - 28 ft lb * footrest bolts - 6mm=4 nm/8 mm= 16 ft lb/10 mm=32 ft lb * center stand bolts - 16 ft lb * side stand bolts - 32 ft lb * engine mounting bolts - see p 2.6 * front shock absorber lower mounting bolt - 32 ft lb * front shock absorber upper mounting bolt - 35 ft lb * telever/swingarm pivot shaft bolt - 55 ft lb * handlebar clamp bolts - 16 ft lb * front axle bolt - 22 ft lb * front axle clamp bolts - 16 ft lb * front fork yoke bolts - * rear wheel bolts - 88 ft lb final setting * brake caliper mounting bolts - 30 ft lb * brake hose banjo bolts - 12 ft lb * caliper bleed valves - 5 ft lb * brake disk bolts - 16 ft lb * muffler front mounting bolts - 15 ft lb * muffler rear mounting bolts - 18 ft lb * muffler clamp bolt - 27 ft lb Notes: 4 please send revisions to mb@rentk.com